Trenger du hjelp fra en anbudsekspert? Se vår anbudsforberedelsestjeneste
Anbud

Supply and Installation of addition solar PV panel generation system

Lukket
Frist
Frist ikke oppgitt
Kontraktsdetaljer
Kategori
Open Procedure
Referanse
036061-2026
Verdi
Ikke oppgitt
Sted
Greater Manchester, Storbritannia
Publisert
28. september 2026
Organisasjon
CPV-kode
Prosjektets tidslinje

Anbud publisert

21. april 2026

KjøperinnsiktPRO
🔒
Lås opp kjøperinnsikt
Se forbruksmønstre, foretrukne prosedyrer og mer.
Oppgrader til Professional →
Budsjett
Ikke oppgitt
Varighet
Ikke spesifisert
Sted
Greater Manchester
Type
Open Procedure

Opprinnelig anbudsbeskrivelse

The University of Salford seeks proposals to supply and install additional PV generation to one of its buildings. The Northern Engineering Robotics Innovation Centre (NERIC) was constructed in 2022 for the University of Salford, the first building on its new Innovation Campus on Frederick Road, M6 6AP. At the time it was fitted out with 15 kWp onto its higher flat roof. The roof was originally designed to accommodate more panels, but these were reduced in a value engineering exercise. 2.0 Goods and Services to be provided The University seeks to double the amount by adding another 15 kWp bringing the total to 30kWp on the existing higher, gravel ballasted flat roof, easily visible from google satellite, while still maintaining access to service plant and the PV system. We can provide hourly data for 2025 for import, generation and export and would want a model worked up using this data as a basis but on double the existing building consumption (c55,000 kWh/yr to 110,000kWh/yr) as we are expecting this to rise very shortly. Modelling should show generation, import, export, costs saved over 20-year period as a minimum, carbon saved using current grid carbon intensity, payback periods etc including inverter replacement at year 10. Work on a current electricity import price of 28p/kWh and a grid (import) carbon intensity of 177g CO2e/kWh and an export price of 5.6p/kWh Can you please provide us with a proposal and quote to include. • A cost/carbon/payback model based on the above parameters. • A rough breakdown of costs in your quote rather than a single figure. • Provide the data sheets for the proposed panels, non-penetrating fixing system and inverters. • The combined panel/fixing weight as kg/m2 as installed on the roof. • State the panel and inverter warranty. If it doesn't already have it, the inverter should have a minimum 10-year warranty. • The generation meter provided or utilising the existing one will need to be linked to our BMS system. • How and where you intend to lift the panels and fixings onto the roof. • Provide a separate option for battery storage, it's price and impact on export. • You would be expected to carry out all the liaison for approvals with the DNO. • Comply with the University's standard T&Cs for this type of electrical work. • Two references with contact details for similar systems you have installed.

Risikoanalyse

Risikoanalyse er ikke tilgjengelig for dette landets anbud ennå. Støttes for øyeblikket: Estland, Latvia, Litauen, Polen, Frankrike, Storbritannia, Danmark, Nederland, Norge og Finland.

Vinnstrategi

Få en AI-drevet vinnerstrategi skreddersydd for dette anbudet. Inkluderer sannsynlighetsscore for å vinne, viktige muligheter og utfordringer, anbefalte fokusområder for tilbudet, innsikt i konkurranseposisjonering og handlingsrettede anbefalinger for å maksimere sjansene dine.

Logg inn

Konkurrenter

Oppgrader for å se hvilke selskaper som sannsynligvis vil legge inn tilbud på dette anbudet, basert på historiske anskaffelsesdata.

Logg inn

Krav og kvalifikasjoner

AI trekker ut og organiserer alle krav fra anbudsunderlagene – obligatoriske kvalifikasjoner, tekniske spesifikasjoner, finansielle betingelser og innleveringsregler – tydelig kategorisert slik at du vet nøyaktig hva som kreves for å gi et tilbud.

Logg inn

Grunnleggende krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenter

3 dokumenter tilgjengelig med AI-sammendrag

OCDS RecordDOC
036061-2026_ocds_record.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
OCDS Release PackageDOC
036061-2026_ocds_release.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
Official PDF VersionPDF
036061-2026_official.pdf

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis

Forhåndsvisning av dokumenter

Registrer deg for å se dokumentoppsummeringer og analyser

Kvalitetsscore

Omfattende kvalitetsanalyse av dette anbudet som vurderer juridisk samsvar, klarhet, fullstendighet, rettferdighet, praktisk gjennomførbarhet, datakonsistens og bærekraft på en skala fra 0-100 med detaljert oversikt og anbefalinger.

Logg inn