Trenger du hjelp fra en anbudsekspert? Se vår anbudsforberedelsestjeneste
Anbud

Aircraft Commodity Consumables

Lukket
Frist
Frist ikke oppgitt
Kontraktsdetaljer
Kategori
Open Procedure
Referanse
061345-2026
Verdi
£78,653,000
Sted
Inner London - West, Storbritannia
Publisert
23. september 2026
CPV-kode
Prosjektets tidslinje

Anbud publisert

30. juni 2026

Kontraktens startdato

28. mai 2026

KjøperinnsiktPRO
🔒
Lås opp kjøperinnsikt
Se forbruksmønstre, foretrukne prosedyrer og mer.
Oppgrader til Professional →
Budsjett
£78,653,000
Varighet
Ikke spesifisert
Sted
Inner London - West
Type
Open Procedure

Opprinnelig anbudsbeskrivelse

The Support Capabilities & Commodities Team have a requirement to deliver approved Commercial of the Shelf (COTS) aircraft spares to MOD locations within the United Kingdom. The initial scope of Aircraft Commodity Consumables (ACC) will comprise of approximately 11,000 consumable aircraft spares with unique NATO Stock Numbers (NSN’s), however there is a requirement to implement a mechanism in the contract to permit scope expansion, up to a maximum of 15,000 NSN’s. ACC will require the following services: a. Contract Management b. Delivery of Service (including supply chain analysis to influence supply chain modelling) c. Delivery of Spares to the Support Capabilities & Commodities Depot d. Obsolescence Management e. Ad hoc Technical Support The core element of the ACC project requires prospective suppliers to carry out spares modelling and procurement activity utilising assumptions and historical consumption data to evaluate future spares requirements. This spares modelling will demonstrate that the proposed spares procurements will meet predicted future requirements and provide confidence in spares availability across all consuming Defence platforms. Airworthiness is a material attribute that reflects the time, cost and effort in accurately evidencing (and documenting) that an item was produced in accordance with its design or specification by an organisation with appropriate credentials for the intended use. For the consumable items included within the scope of ACC, the sum-total of the item, labelling and accompanying documentation (including traceability to source with evidence that the manufacturer has recognised quality management system) form the argument that the item is “Airworthy”. This enables the maintainers, Military Continuing Airworthiness Organisations (MilCAMOs), to use the items to fix an aircraft. Therefore, if the items delivered do not meet the requirements placed on the MilCAMOs then the items cannot be used on an aircraft. Our regulator, the Military Aviation Authority (MAA), set Regulatory Articles (RAs) that civil servants working in the Defence Air Environment (DAE) are legally obliged to follow. The collection of these rules and supporting guidance is known as the MAA Regulatory Publications (MRP). The role of the Engineering Authority (EA) is to provide technical oversight and assurance, ensuring that civilian standards of Safety are achieved So Far As Reasonably Practicable achieved and that any residual risk(s) are transferred to Aviation Duty Holders (ADHs). This should be accomplished through compliance with the MRP and applicable aerospace standards. Where regulatory compliance cannot be achieved the EA should compile evidence and apply to the regulator for ‘Alternative Acceptable Means of Compliance’, a Waiver or an Exemption. Where compliance with Aerospace standards cannot be achieve the EA is responsible for ensuring risk is identified, evaluated and where appropriate transferred to ADHs. There are no plans to issue Design Organisation “privilege ” as part of ACC. The Platforms supported through ACC have planned Out of Service Dates (OSDs) between 2025 and 2046 (in accordance with the Strategic Defence Review 24/25. Between 2025 and 2046 a number of manned and unmanned platforms may be introduced into service, contract amendments may be required to provide consumables for these platforms. The Cyber Risk Profile for this requirement identified by the Cyber Risk Assessment is High (Reference - RAR-250128A16) Transfer of Undertakings (Protection of Employments) (TUPE) will apply to this requirement. UK1: Pipeline notice was published under Notice identifier: 2025/S 000-024717 UK2: Preliminary market engagement notice was published under Notice identifier: 2025/S 000-007556

Risikoanalyse

Risikoanalyse er ikke tilgjengelig for dette landets anbud ennå. Støttes for øyeblikket: Estland, Latvia, Litauen, Polen, Frankrike, Storbritannia, Danmark, Nederland, Norge og Finland.

Vinnstrategi

Få en AI-drevet vinnerstrategi skreddersydd for dette anbudet. Inkluderer sannsynlighetsscore for å vinne, viktige muligheter og utfordringer, anbefalte fokusområder for tilbudet, innsikt i konkurranseposisjonering og handlingsrettede anbefalinger for å maksimere sjansene dine.

Logg inn

Konkurrenter

Oppgrader for å se hvilke selskaper som sannsynligvis vil legge inn tilbud på dette anbudet, basert på historiske anskaffelsesdata.

Logg inn

Krav og kvalifikasjoner

AI trekker ut og organiserer alle krav fra anbudsunderlagene – obligatoriske kvalifikasjoner, tekniske spesifikasjoner, finansielle betingelser og innleveringsregler – tydelig kategorisert slik at du vet nøyaktig hva som kreves for å gi et tilbud.

Logg inn

Grunnleggende krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenter

3 dokumenter tilgjengelig med AI-sammendrag

OCDS RecordDOC
061345-2026_ocds_record.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
OCDS Release PackageDOC
061345-2026_ocds_release.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
Official PDF VersionPDF
061345-2026_official.pdf

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis

Forhåndsvisning av dokumenter

Registrer deg for å se dokumentoppsummeringer og analyser

Kvalitetsscore

Omfattende kvalitetsanalyse av dette anbudet som vurderer juridisk samsvar, klarhet, fullstendighet, rettferdighet, praktisk gjennomførbarhet, datakonsistens og bærekraft på en skala fra 0-100 med detaljert oversikt og anbefalinger.

Logg inn