Hulp van een aanbestedingsexpert nodig? Bekijk onze dienst voor aanbestedingsvoorbereiding
Aanbestedingen

QEII Memorial Programma – Hoofdaannemer

Open
Deadline
92 dagen resterend
29 januari 2027
Contractdetails
Categorie
Overig
Referentie
099212-2026
Waarde
£30,000,000
Locatie
London, Verenigd Koninkrijk
Gepubliceerd
21 oktober 2026
CPV-code
Projecttijdlijn

Aanbesteding gepubliceerd

20 oktober 2026

Deadline voor vragen

22 januari 2027

Deadline voor inschrijving

29 januari 2027

Startdatum contract

30 augustus 2027

Budget
£30,000,000
Looptijd
29 maanden
Locatie
London
Type
Overig

Originele aanbestedingsbeschrijving

Contracting authority: Department for Digital, Culture, Media and Sport (DCMS) Procurement title: QEII Memorial Programme – Principal / Main Contractor Procurement identifier: 105267 Notice type: UK2 – Preliminary Market Engagement Notice Estimated contract value (excluding VAT): £25,000,000 - £27,500,000 Contract location: St James's Park, London, United Kingdom CPV codes: 45200000 - Works for complete or part construction and civil engineering work 45111000, 45111100, 45215000, 45112711, 45233222, 45111300, 45212350, 45212314, 45262510, 45112000, 45111213, 45112100-6, 45112700, 77310000, 77300000, 03451000, 03451300 Expected tender notice publication: January 2027 Market engagement closing date: 31 December 2026 Procurement contact / portal: DCMS procurement portal Description of the requirement The Department for Digital, Culture, Media and Sport (DCMS) is undertaking preliminary market engagement in connection with the proposed procurement of a Principal/Main Contractor to supply works in respect of the Queen Elizabeth II Memorial programme. The proposed appointment will involve the management, coordination and delivery of a complex, multidisciplinary programme of construction, enabling works, public realm improvements and specialist installations within St James's Park, London. The anticipated scope includes: Enabling works, including site establishment, surveys, site clearance, protection of existing assets, temporary works and associated utilities and infrastructure; Demolition and removal of the existing bridge, including associated temporary works, protection of adjacent assets, disposal of materials and coordination with the wider construction programme; Construction of the foundations and associated substructures for the new bridge, including groundworks, excavation, reinforced concrete works, drainage and associated civil engineering interfaces; Installation of the new bridge, including site preparation, lifting and installation operations, temporary works and coordination with the separately appointed Bridge Contractor responsible for fabrication of the bridge structure, glass balustrades and incorporated paving, with the detailed allocation of installation responsibilities to be confirmed through the procurement and contractual arrangements; Demolition and reconstruction of existing public toilet facilities, including associated building services and integration with the surrounding public realm; Hard landscaping, including paving, pathways, groundworks, levels, drainage, external finishes and associated civil engineering works; Soft landscaping, including sourcing and procurement of plants, trees and other planting materials, ground preparation, planting and landscape establishment; Heritage works, including the careful dismantling, movement, relocation and reinstatement of Grade II listed structures, subject to relevant statutory consents and heritage protection requirements; Memorial installations, including coordination and liaison with the appointed artist and relevant specialists to facilitate the installation of memorial statues, sculptures and associated elements; Specialist contractor interfaces, including coordination with the separately procured Bridge Contractor responsible for the stainless steel bridge structure, glass balustrades, incorporated paving and associated works; Construction management and integration, including logistics, site access, sequencing, temporary works, health and safety, quality assurance, programme coordination and stakeholder management; and Completion and handover, including testing, commissioning where applicable, reinstatement, defects management and handover to DCMS and relevant operational stakeholders. The works will take place within a sensitive historic park environment, requiring careful management of public access, heritage assets, existing landscape features, construction logistics and stakeholder interfaces. Indicative Timescales The current indicative programme anticipates award of the Stage 1 Pre-Construction Services Agreement (PCSA) in August 2027 and the Stage 2 main construction works contract in May 2028. These dates are estimates and remain subject to procurement outcomes, programme development and the necessary DCMS approvals. The anticipated duration and completion date of the Stage 2 construction works have not yet been determined. These will be developed during Stage 1, or as part of the formation of the Stage 2 contract, taking account of the appointed contractor's proposed construction methodology, interfaces with the specialist Bridge Contractor, wider programme dependencies and seasonal landscaping requirements. Proposed Procurement and Delivery Approach DCMS is considering a two-stage appointment for the Principal/Main Contractor, comprising an initial Pre-Construction Services Agreement (PCSA) for Early Contractor Involvement, construction planning, buildability review, supply-chain engagement and development of the construction price, followed by a separate commitment to the main construction works. The proposed scope includes enabling works, demolition and reconstruction of public toilet facilities, hard and soft landscaping, relocation and reinstatement of Grade II listed structures, coordination of memorial installations with the appointed artist, and integration of the separately appointed specialist Bridge Contractor. DCMS is considering a competitive flexible procedure under the Procurement Act 2023, incorporating an initial assessment of supplier capability and a subsequent tender stage. The proposed arrangements include coordination with the Bridge Contractor during pre-construction and its intended subsequent novation to the Principal/Main Contractor, subject to agreed contractual arrangements and approvals. The proposed approach remains subject to market engagement and DCMS governance approvals.

Risicoanalyse

Risicoanalyse is nog niet beschikbaar voor aanbestedingen uit dit land. Momenteel ondersteund: Estland, Letland, Litouwen, Polen, Frankrijk, VK, Denemarken, Nederland, Noorwegen en Finland.

Winststrategie

Ontvang een AI-gestuurde winnende strategie, afgestemd op deze aanbesteding. Inclusief winstkansscore, belangrijke kansen en uitdagingen, aanbevolen focusgebieden voor de inschrijving, inzichten in concurrentiepositie en actiegerichte aanbevelingen om je kansen te maximaliseren.

Inloggen

Concurrenten

Upgrade om te zien welke bedrijven waarschijnlijk op deze aanbesteding zullen inschrijven, gebaseerd op historische inkoopgegevens.

Inloggen

Vereisten & Kwalificaties

AI extraheert en organiseert alle vereisten uit aanbestedingsdocumenten – verplichte kwalificaties, technische specificaties, financiële voorwaarden en indieningsregels – duidelijk gecategoriseerd zodat je precies weet wat nodig is om in te schrijven.

Inloggen

Basisvereisten

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documenten

3 documenten beschikbaar met AI-samenvattingen

OCDS RecordDOC
099212-2026_ocds_record.json

Geen samenvatting beschikbaar voor dit document.

OCDS Release PackageDOC
099212-2026_ocds_release.json

Geen samenvatting beschikbaar voor dit document.

Official PDF VersionPDF
099212-2026_official.pdf

Geen samenvatting beschikbaar voor dit document.

Voorbeeld van documenten

Meld je aan om document samenvattingen en analyse te bekijken

Kwaliteitsscore

Uitgebreide kwaliteitsanalyse van deze aanbesteding, beoordeelt juridische naleving, duidelijkheid, volledigheid, eerlijkheid, praktische uitvoerbaarheid, gegevensconsistentie en duurzaamheid op een schaal van 0-100 met gedetailleerde uitsplitsing en aanbevelingen.

Inloggen