Hulp van een aanbestedingsexpert nodig? Bekijk onze dienst voor aanbestedingsvoorbereiding
Aanbestedingen

PRO005166 - ORiW - Ontwerp- en Integratiepartner

Open
Deadline
7 dagen resterend
5 november 2026
Contractdetails
Categorie
Overig
Referentie
099229-2026
Waarde
£720,000,000
Locatie
North West England, Verenigd Koninkrijk
Gepubliceerd
21 oktober 2026
CPV-code
Projecttijdlijn

Aanbesteding gepubliceerd

21 oktober 2026

Deadline voor vragen

29 oktober 2026

Deadline voor inschrijving

5 november 2026

Startdatum contract

1 april 2027

Budget
£720,000,000
Looptijd
48 maanden
Locatie
North West England
Type
Overig

Originele aanbestedingsbeschrijving

This notice relates to market engagement activity for the provision of certain design and integration services, as explained below. United Utilities Water Ltd (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. • Reduced weather dependent flow, surface water management and management and treatment of highways runoff through the use of nature- based solutions where possible across the catchment. • Construction of tunnel and rising mains. • Upgrade of an existing wastewater treatment works and discharge point. UU anticipates that the ORiW system and the other strategic wastewater transfer and treatment infrastructure required for the ORiW programme (including the tunnel, rising mains, pumping stations, wastewater treatment facilities, associated drainage works and all ancillary infrastructure), will be promoted through a Development Consent Order (DCO) as a Nationally Significant Infrastructure Project (NSIP), subject to Section 35 approval by Defra. UU will shortly be launching a competitive tendering procedure for the appointment of a Design and Integration Partner (D&IP) who will be responsible for supporting the next phase of this programme, designing the ORiW system, including whole system integration, to achieve the programme vision. UU requires the D&IP to complete feasibility, outline design, constructability and other related activities to obtain the necessary approvals and consents for the programme to proceed to the delivery phase for the preferred solution. Accordingly, the D&IP will also be responsible for the delivery of the DCO and planning approvals. As such, the outline design needs to fully support and integrate with the DCO, Town and Country Planning Act (TCPA) and land acquisition and access processes. At a high level, the initial scope of requirements for the D&IP will include, but may not be limited to the following activities across each of the workstreams of the ORiW system; • Outline Design • Planning, Consents and Land • Environmental Impact Assessments (EIA) and surveys • Stakeholder and Customer Engagement • Land Agency, Referencing and Surveying • Preparation and submission of planning applications and all supporting information • Preparation and submission of the DCO and all supporting information • Ground Investigation (GI) • Early Contractor involvement (ECI) • Supporting UU in meeting our reporting requirements with Ofwat UU require a D&IP who has the capability and experience to ensure coordination over integration of all elements of the ORiW system and all other related activities that are required. The D&IP will also need to be capable of leading the overall delivery strategy, managing interfaces across the programme, maintaining design consistency, and ensuring that the complete solution meets the requirements to obtain the necessary approvals and consents. UU is continuing to consider its approach to the delivery phase of the programme and anticipates that it may need ongoing support from the D&IP into the delivery phase to provide continuity throughout the programme lifecycle. The precise form that this ongoing support may take will be dependent on the precise delivery model that UU adopts, but this may include (without limitation): • The D&IP acting as system integrator and detailed design partner to either UU and/or any prime contractor engaged in relation to the programme. • The D&IP acting as a system integrator partner to provide support across different workstreams and work packages forming part of the programme so that the overall programme is delivered as seamlessly as possible. • Providing alternative services to support UU’s client-side management of delivery partners engaged to undertake the delivery phase of the programme. It is also conceivable that the D&IP will not be required to provide any ongoing support during the delivery phase. Anticipated value of each role; • Design & Integration Partner (pre delivery phase) > 4 years = circa £60-100m • System Integrator Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa £100m (subject to CPIH) • System Integrator and Detailed Design Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa £500m (subject to CPIH) Please note that the total value is given as a range (£60m to £600m) which includes the minimum and maximum total estimated values across those roles. As explained above, the system integrator partner (during delivery phase) and system integrator and detailed design partner roles are alternatives and so the combined value of each is not included in the total (only the higher of the two). This notice does not constitute a call for competition, and does not commit United Utilities to undertake any future procurement.

Risicoanalyse

Risicoanalyse is nog niet beschikbaar voor aanbestedingen uit dit land. Momenteel ondersteund: Estland, Letland, Litouwen, Polen, Frankrijk, VK, Denemarken, Nederland, Noorwegen en Finland.

Winststrategie

Ontvang een AI-gestuurde winnende strategie, afgestemd op deze aanbesteding. Inclusief winstkansscore, belangrijke kansen en uitdagingen, aanbevolen focusgebieden voor de inschrijving, inzichten in concurrentiepositie en actiegerichte aanbevelingen om je kansen te maximaliseren.

Inloggen

Concurrenten

Upgrade om te zien welke bedrijven waarschijnlijk op deze aanbesteding zullen inschrijven, gebaseerd op historische inkoopgegevens.

Inloggen

Vereisten & Kwalificaties

AI extraheert en organiseert alle vereisten uit aanbestedingsdocumenten – verplichte kwalificaties, technische specificaties, financiële voorwaarden en indieningsregels – duidelijk gecategoriseerd zodat je precies weet wat nodig is om in te schrijven.

Inloggen

Basisvereisten

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documenten

3 documenten beschikbaar met AI-samenvattingen

OCDS RecordDOC
099229-2026_ocds_record.json

Geen samenvatting beschikbaar voor dit document.

OCDS Release PackageDOC
099229-2026_ocds_release.json

Geen samenvatting beschikbaar voor dit document.

Official PDF VersionPDF
099229-2026_official.pdf

Geen samenvatting beschikbaar voor dit document.

Voorbeeld van documenten

Meld je aan om document samenvattingen en analyse te bekijken

Kwaliteitsscore

Uitgebreide kwaliteitsanalyse van deze aanbesteding, beoordeelt juridische naleving, duidelijkheid, volledigheid, eerlijkheid, praktische uitvoerbaarheid, gegevensconsistentie en duurzaamheid op een schaal van 0-100 met gedetailleerde uitsplitsing en aanbevelingen.

Inloggen