Looking to bid on government tenders? See our TaaS tender preparation service
Tenders

Charities Hub - Parapet Wall Replacement

Open
Deadline
15 days left
June 24, 2026
Contract Details
Category
Open Procedure
Reference
051399-2026
Value
£108,000
Location
Berkshire, Buckinghamshire and Oxfordshire, United Kingdom
Published
June 02, 2026
CPV Code
Project Timeline

Tender Published

June 01, 2026

Deadline for Questions

June 17, 2026

Submission Deadline

June 24, 2026

Contract Start Date

August 13, 2026

Budget
£108,000
Duration
15 months
Location
Berkshire, Buckinghamshire and Oxfordshire
Type
Open Procedure

Original Tender Description

The Charities Hub is combination of the Arts Centre & Meeting Place, constructed circa 1971-72, and forms two thirds of the Galley Hill Local Centre. The Local Centre is a steel framed building consisting of shops, the Arts Centre at Ground Floor and a Small Meeting Place located at first floor above the retail units, consisting of a function room with ancillary rooms. The fabric of the buildings consists of external infill wall panels made up of brickwork and galvanised Steel crittal windows. The roofs at first floor are flat roofs, made of metal profile decking and a mineral felt membrane system. The first-floor slab, including the balcony roofs, is a beam and clay pot system with a concrete screed. The balcony areas, on both sides of the Meeting Place, have an asphalted surface. Milton Keynes City Council is looking for a contractor to undertake the works to rebuild the parapet wall to the 1st floor of the Charities Hub in Galley Hill. The works consist of: Submission of Building Control Application. The Contractor shall prepare and submit all necessary documentation to Building Control to obtain approval prior to commencement of works. Parapet Wall Reconstruction The Contractor shall undertake a full rebuild of the first‑floor parapet wall in accordance with the DSA proposed drawings and planning approval PLN/2025/0172. Abutment and Weathering Details The Contractor shall form all necessary junction details at parapet abutments and installing flashing with a gutter at the parapet base to prevent water accumulation. Works are to comply with BS standard and Building Control as per Pre Construction information – Appendix D. Works are to start in August 26 with an anticipated 10-week contract. This is to allow works to be undertaken in a safe manner. Works will be undertaken under a JCT Minor Works with Contractors Design 2024 edition.

Risk Analysis

Risk analysis is not yet available for this country's tenders. Currently supported: Estonia, Latvia, Lithuania, Poland, France, UK, Denmark, Netherlands, Norway, and Finland.

Win Strategy

Get an AI-powered winning strategy tailored to this tender. Includes win probability score, key opportunities and challenges, recommended bid focus areas, competitive positioning insights, and actionable recommendations to maximize your chances.

Login

Competitors

Upgrade to see which companies are likely to bid on this tender, based on historical procurement data.

Login

Requirements & Qualifications

AI extracts and organizes all requirements from tender documents — mandatory qualifications, technical specifications, financial conditions, and submission rules — clearly categorized so you know exactly what's needed to bid.

Login

Basic Requirements

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

3 documents available with AI summaries

OCDS RecordDOC
051399-2026_ocds_record.json

No summary available for this document.

OCDS Release PackageDOC
051399-2026_ocds_release.json

No summary available for this document.

Official PDF VersionPDF
051399-2026_official.pdf

No summary available for this document.

Documents Preview

Sign up to view document summaries and analysis

Quality Score

Comprehensive quality analysis of this tender scoring legal compliance, clarity, completeness, fairness, practicality, data consistency, and sustainability on a 0-100 scale with detailed breakdown and recommendations.

Login

Add to Pipeline