Vajad hankeeksperdi abi? Vaata meie hangete ettevalmistuse teenust
Tagasi hangete juurde

FCDO Accra Briti Ülemkomisjoni büroode ümberehitus, Ghana

Avatud
Tähtaeg
26 päeva jäänud
21. detsember 2026
Lepingu üksikasjad
Kategooria
Restricted Procedure
Viide
110383-2026
Väärtus
£11,654,291
Asukoht
Inner London - West, Ühendkuningriik
Avaldatud
18. november 2026
CPV kood
Projekti ajakava

Hange avaldatud

21. november 2026

Küsimuste tähtaeg

14. detsember 2026

Esitamise tähtaeg

21. detsember 2026

Lepingu alguskuupäev

2. juuni 2027

Ostja analüütikaPRO
🔒
Avage ostja analüütika
Vaadake kulutusmustreid, eelistatud menetlusi ja palju muud.
Uuenda Professionaalseks →
Eelarve
£11,654,291
Kestus
41 kuud
Asukoht
Inner London - West
Tüüp
Restricted Procedure

Algne hanke kirjeldus

Project Overview 1.1 The route to market is the Competitive Flexible Procedure. This will comprise of a Request to Participate stage with Conditions of Participation questions and an Invitation to Tender stage. 1.2 The scope of the project is to redevelop two existing sites (Afadja and Volta) to accommodate the British High Commission. The British High Commission (Ghana) estate is made up of two sites that sit side by side. It is located on Julius Nyerere Link Road in a reasonably affluent and central part of Accra, close to Parliament, the Presidency and some Ministries. The office estate in Accra is tired and in poor condition (in places), having suffered from a lack of strategic investment and maintenance. 1.3 It is anticipated that the consturction will take place in phases. Work will start at the Volta site which will be vacant throughout construction (staff normally based at this site will be temporarily moved to the Afadja Site). Once construction works at the Volta site are complete, all of the staff at the Afadja site will be transferred to the Volta site to enable the phase 2 works to be undertaken in the unoccupied Afadja building. 1.4 In line with the overall estate strategy, the intention is to have the Volta HC Office staff move to the Afadja High Commission for the duration of the Volta construction period. 1.5 The existing sites comprises of: • An existing split-site office building. It is proposed that the Volta building be retained and refurbished. • Existing plant structures to be demolished to make way for new extension. • Existing external landscaping to be demolished in some areas to make way for new cloister and walkway. 1.6 Part of the site development design includes: • Undertaking minor works to the existing Afadja site to make suitable to be used as a decant property whilst works to the Volta building are undertaken. • Refurbish the existing building to a fit-for-purpose, open plan office standard. • Replacement of existing mechanical and electrical installations. • Seismic strengthening and associated structural works. • External works to create shared internal and external spaces. 1.7 The Contractor, as well as any engaged sub-contractors, are required to perform all work in accordance with the relevant UK Standards. The construction must meet established UK standards throughout the build process. 2. It is anticipated that the works will be undertaken under the NEC form of contract; ECC 4, Option A (Priced Contract with an Activity Schedule). 3. The project team is also considering the inclusion of an Early Contractor Involvement stage ahead of the construction stage. Both stages will be within the same contract. 4. Some areas of the building will be classified as higher security and will require a separate specialist contractor. These works will not form part of this requirement/contract. However, the parameter and interface between the higher classified areas and the works within this requirement will require security cleared personnel at Security Check (SC*) level to manage the works. Contractor’s will need to be able to provide such personnel before the works contract can begin. *SC is a process of security vetting. Further details can be found at https://www.gov.uk/government/publications/united-kingdom-security-vetting-clearance-levels/national-security-vetting-clearance-levels#security-check-sc. 5. Below is a schedule of key market engagement and tendering activities (subject to change): Activity Date Issue PSQ 20th November 2026 Issue ITT Early February 2027 Bidders day During ITT period Proposed Bid Deadline Late March 2027 Contract Award June 2027

Riskianalüüs

Riskianalüüs pole veel selle riigi hangete jaoks saadaval. Praegu toetatud: Eesti, Läti, Leedu, Poola, Prantsusmaa, Ühendkuningriik, Taani, Holland, Norra ja Soome.

Võidustrateegia

Saate tehisintellektil põhineva võidustrateegia, mis on kohandatud sellele hankele. Sisaldab võidutõenäosuse skoori, peamisi võimalusi ja väljakutseid, soovituslikke pakkumise fookusalasid, konkurentsipositsioonide ülevaadet ja tegevussoovitusi.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

Tehisintellekt eraldab ja korrastab kõik nõuded hankedokumentidest — kohustuslikud kvalifikatsiooninõuded, tehnilised spetsifikatsioonid, finantstingimused ja esitamise reeglid — selgelt kategoriseerituna.

Logi sisse

Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

3 dokumenti saadaval koos AI kokkuvõtetega

OCDS RecordDOC
110383-2026_ocds_record.json

Selle dokumendi jaoks pole kokkuvõtet saadaval.

OCDS Release PackageDOC
110383-2026_ocds_release.json

Selle dokumendi jaoks pole kokkuvõtet saadaval.

Official PDF VersionPDF
110383-2026_official.pdf

Selle dokumendi jaoks pole kokkuvõtet saadaval.

Dokumentide eelvaade

Registreeru, et näha dokumentide kokkuvõtteid ja analüüsi

Kvaliteediskoor

Selle hanke põhjalik kvaliteedianalüüs, mis hindab õiguslikku vastavust, selgust, täielikkust, õiglust, praktilisust, andmete järjepidevust ja jätkusuutlikkust skaalal 0–100 koos üksikasjaliku jaotuse ja soovitustega.

Logi sisse