Vajad hankeeksperdi abi? Vaata meie hangete ettevalmistuse teenust
Tagasi hangete juurde

Rail Replacement System

Suletud
Tähtaeg
Tähtaeg pole märgitud
Lepingu üksikasjad
Kategooria
Negotiated Procedure
Viide
041821-2026
Väärtus
£6,325,800
Asukoht
Inner London - East, Ühendkuningriik
Avaldatud
7. november 2026
CPV kood
Projekti ajakava

Hange avaldatud

7. mai 2026

Lepingu alguskuupäev

7. aprill 2026

Eelarve
£6,325,800
Kestus
Pole määratud
Asukoht
Inner London - East
Tüüp
Negotiated Procedure

Algne hanke kirjeldus

The requirement for this procurement is four Rail Replacement Gantries systems for use on the HS1 route. The gantry system must be able to deliver the following requirements and conform to particular interfaces: Key requirements: System must deliver renewals in CP4 System must operate in single-bore tunnel environment System must perform rail replacement activities in weeknight shift System must be capable of exchanging both S&C assets and CWR System must deliver rail, exchange rails, and collect scrap in the same working shift Key considerations for interface groups: Permanent way: The track gauge is 1435mm. The rail type is UIC60 (aka CEN60) on mainly ballasted track with twin block sleepers, and ~50km single track on slab track. The maximum installed cant is 160mm. The maximum gradient is 1 in 40 (2.5%). Open sections have a maximum speed of 300km/h, with track centres spaced at 4.5m. The infrastructure is predominantly built to GC gauge. UIC GB+ gauge applies to the Ashford connecting lines on the NR Network. The most restrictive, W6a gauge applies to a small number of locations on NRHS-managed infrastructure. Buildings & Civils: Several tunnels exist on HS1 including twin tunnels under London from Stratford westwards towards St Pancras and eastwards towards Dagenham. Tunnel depth varies between 24m and 50m. The two London tunnels are 7.5km and 10.1km long and split by Stratford International station. Other major tunnels include the 3.1km tunnel under the Thames at Thurrock in Essex and the 3.2km North Downs Tunnel near Maidstone in Kent. HS1 features several major viaducts with three exceeding 1km in length: Medway Viaduct carries the line over the river Medway adjacent to the M2 motorway, Thurrock Viaduct takes the line over the A282 Dartford Crossing and Ashford Viaduct takes the fast lines over Ashford International station. Signalling & Telecoms (S&T): TVM430 in-cab signalling is used across the infrastructure - except at Ashford and St Pancras International stations which are equipped with the KVB train protection system. Electricfication & Plant (E&P): Catenary compliant with the Energy (High Speed) TSI supplies 25kV at 50Hz AC. The contact wire height is 5080mm above rail level except for the Ashford Station platforms where it is at 4680mm minimum. Maintenance Depot: The infrastructure maintenance depot for HS1, Singlewell Infrastructure Maintenance Depot (SIMD), is located at Singlewell, near to Gravesend, Kent. Storage, maintenance and overhaul of the proposed system would need to take place at SIMD. The contract will also includes the provision of training for Network Rail High Speed personnel to operate and maintain the Gantries once they are delivered to site.

Riskianalüüs

Riskianalüüs pole veel selle riigi hangete jaoks saadaval. Praegu toetatud: Eesti, Läti, Leedu, Poola, Prantsusmaa, Ühendkuningriik, Taani, Holland, Norra ja Soome.

Võidustrateegia

Saate tehisintellektil põhineva võidustrateegia, mis on kohandatud sellele hankele. Sisaldab võidutõenäosuse skoori, peamisi võimalusi ja väljakutseid, soovituslikke pakkumise fookusalasid, konkurentsipositsioonide ülevaadet ja tegevussoovitusi.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

Tehisintellekt eraldab ja korrastab kõik nõuded hankedokumentidest — kohustuslikud kvalifikatsiooninõuded, tehnilised spetsifikatsioonid, finantstingimused ja esitamise reeglid — selgelt kategoriseerituna.

Logi sisse

Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

3 dokumenti saadaval koos AI kokkuvõtetega

OCDS RecordDOC
041821-2026_ocds_record.json

Selle dokumendi jaoks pole kokkuvõtet saadaval.

OCDS Release PackageDOC
041821-2026_ocds_release.json

Selle dokumendi jaoks pole kokkuvõtet saadaval.

Official PDF VersionPDF
041821-2026_official.pdf

Selle dokumendi jaoks pole kokkuvõtet saadaval.

Dokumentide eelvaade

Registreeru, et näha dokumentide kokkuvõtteid ja analüüsi

Kvaliteediskoor

Selle hanke põhjalik kvaliteedianalüüs, mis hindab õiguslikku vastavust, selgust, täielikkust, õiglust, praktilisust, andmete järjepidevust ja jätkusuutlikkust skaalal 0–100 koos üksikasjaliku jaotuse ja soovitustega.

Logi sisse